TUGA is in the process of manufacturing 25 MW industrial gas turbines in cooperation with Zorya-Mashproket (Ukraine). The complete design of the test station together with the necessary test calculations has been done in R&D office. The test bench was commissioned in August 2013. In a separate project, the R&D office designed a Test Rig for conducting performance and mechanical test of a Frunze (Ukraine) compressor according to the latest international standards. The test bench was commissioned in October 2014.