Monenco Iran has recently signed a contract of "Consultancy Services for Preparation of Distribution Network Master Plan". The client is Mazandaran Electricity Distribution Company.
Master Plan of Electricity Distribution Network Project, designate the guidelines for the development or Modifications of the power grid structure. By specifying the location of the installation, technical specifications and Development Plan of the development of the substations and feeders will optimize the network performance and improve the electrical and economic indicators as well as the inefficient technical structures in each section of the distribution network.