Water | |||
Client | Scope of Work | Start date | Project name |
Tehran Sewerage Company | Engineering services | 2021 | Tehran's SCADA sewage system |
East Azarbaijan Regional Water | Engineering services | 2020 | Pipe inspection, coating and welding of new water transmission line pipes of Nahand |
East Azarbaijan Regional Water | Engineering services | 2020 | The 63 KV overhead line correction in the area of the sewage treatment plant in south of Tehran |
Water and Wastewater Company District 3 of Tehran |
Engineering and consulting services | 2019 | SCADA system within the scope of Water and Sewerage Company, District 3 of Tehran |
Kazerun Petrochemical Company | Evaluation studies | 2017 | The polyethylene project of Kazerun Petrochemical Company |
East Azarbaijan Regional Water | Consulting services | 2017 | The dispatching center of Tehran Wastewater Company |
Water and Wastewater Company District 1 of Tehran |
Engineering and consulting services | 2017 | Abfa Company, Zone 1 of Tehran and Suez Company |
Public Authority for Electricity & Water (PAEW) | Consulting services | 2017 | The Realization of Telecommunication Architecture Study throughout the PAEW Service Area (Client: PAEW |
Zanjan Water and Wastewater | Evaluation studies | 2016 | Telemetry master plan of Zanjan city water facilities |
Montazer Ghaem Power Generation | Reviewing, redesigning and preparing tender documents | 2015 | The wastewater treatment plant of Mantargaem power plant |
Hormozgan Power Generation | Providing advice on the optimization | 2015 | 3 MED water softeners of Bandar Abbas power plant |
MAPNA | Engineering services | 2014 | The first phase of the mapna development roadmap for the simultaneous production of water and electricity needed by areas facing water crisis in the country |
MAPNA | Engineering services | 2014 | The second, third and fourth phases of Mapna Group's activities development roadmap |
Tehran Water Supply and wastewater Treatment Company | Engineering and consulting services | 2014 | Telemetry master plan projects in Tehran (SCADA project) |
Regional Water Company of Kermanshah | Engineering services | 2013 | The second stage of water dispatching of dams in Kermanshah province |
Regional Water Company of Kermanshah | Engineering services | 2013 | The third stage of supervising the dispatching executive operations of Gaushan dam |
Preparation of a report on the comprehensive plan | 2012 | Desalination plants along the Persian Gulf | |
MAPNA MD3 | Engineering and design services | 2011 | The simultaneous production of electricity and water in Qeshm Mapna |
Engineering and consulting services | 2011 | Kabompo George dam hydropower plant in Zambia | |
Engineering services | 2011 | small and medium hydroelectric power plant of Dadinkwa Dam in Nigeria | |
Kish Water and Power Company | Engineering and consulting services | 2009 | installation and operation of the recuperator boiler unit, the 8000 cubic meter distilled water desalination plant and three GIS sets. |